Which of the following would be considered a direct project cost?

Which of the following would be considered a direct project cost? 


A. Labor

B. Materials

C. Equipment

D. Both A and B are direct costs

E. A, B, and C are all considered direct costs


Answer: A, B, and C are all considered direct costs