Companies like Boeing, Kodak, and IBM are using which of the following for improving the estimating process? A. Adjusting estimates based on individual...
Which of the following is not one of the recommended guidelines for developing useful work package estimates?
Which of the following is not one of the recommended guidelines for developing useful work package estimates? A. Estimates should be made by those...
Which of the following would be considered a direct project cost?
Which of the following would be considered a direct project cost? A. LaborB. MaterialsC. EquipmentD. Both A and B are direct costsE. A, B, and C...
Project costs are typically viewed from all of the following except:
Project costs are typically viewed from all of the following except: A. ScheduledB. SunkC. ActualD. CommittedE. All of these are correctAnswer:&...
Typical kinds of costs found in a project include
Typical kinds of costs found in a project include A. Direct costsB. Project overhead costsC. General and administrative costsD. Only A and B are...
The cost to prepare bottom-up estimates will typically run how much more than the costs to prepare the top-down estimates?
The cost to prepare bottom-up estimates will typically run how much more than the costs to prepare the top-down estimates? A. About the sameB. About...
The accuracy of bottom-up estimates will typically be in the range of
The accuracy of bottom-up estimates will typically be in the range of A. Minus 50% to plus 50%B. Minus 0% to plus 75%C. Minus 20% to plus 60%D. Minus...